(鼎恒石油資訊) Weir閥門和控制器部門設(shè)計并交付了兩臺大型高壓Blakeborough®控制閥,以支持印度Mundra至Bathinda原油管道的容量擴展。
此段原油管道由HPCL - Mittal管道有限公司所屬和經(jīng)營,從印度西海岸Mundra港通往印度北部的Bathinda港。管道主要由單點系泊系統(tǒng),原油碼頭和48 "管道組成,總長1017公里,經(jīng)過古吉拉特邦、旁遮普邦、拉賈斯坦邦和哈里亞巴邦。
管道容量擴展項目(MCEP)將于2017/2018年投入運行,并將提高管道容量,終達到1800萬公噸(MMTPA)。Weir公司于2016年底從Engineers India有限公司獲得了一項訂單,為該項目提供了兩臺相對較大的高壓控制閥。這兩個閥門是24寸(600mm),法蘭式900級額定控制閥,具有獨立電液執(zhí)行器。這些閥門將安裝在需要它們對原油進行排氣壓力控制的28寸管道中。這些閥的Cv總設(shè)計為4750。近,經(jīng)過嚴格的功能測試程序并確認控制性能后,閥門才被運送到客戶端。
Simon Tattersall(Weir閥門和控制器銷售總監(jiān))評論說:“這個項目展現(xiàn)了Weir在生產(chǎn)電力和石油和天然氣行業(yè)的各種閥門的多功能性。我們的控制閥工程能力意味著我們可以與客戶合作,按照客戶的要求提供標準和定制閥門。
關(guān)于Weir集團
Weir集團雇有約 14,000 名員工,在 70 多個國家/地區(qū)開展業(yè)務(wù),致力于為具有良好長期發(fā)展前景的市場提供服務(wù)。集團擁有成熟可靠的專業(yè)知識和技術(shù),能夠在全球各地的礦場加工自然資源,也幫助從世界一些嚴苛作業(yè)環(huán)境中出產(chǎn)石油與天然氣。集團與客戶緊密合作,在礦業(yè)、石油與天然氣、電力與工業(yè)市場上為其提供可以提高效率并降低運營成本的產(chǎn)品和服務(wù)。
無論客戶在何時何地需要我們,我們都竭力滿足其需求,致力于成為值得客戶信賴的首選合作伙伴。
關(guān)于鼎恒石油
四川鼎恒石油是Weir SPM的授權(quán)代理商,若需要購買SPM產(chǎn)品或需要了解產(chǎn)品詳細參數(shù)及相關(guān)疑問,可直接進入鼎恒石油官網(wǎng)咨詢網(wǎng)站客服或者撥打銷售熱線18000522697。
四川鼎恒石油機械設(shè)備有限公司(http://www.733vip.cn)是一家擁有進出口經(jīng)營權(quán),長期從事國內(nèi)外石油天然氣設(shè)備和配件的專業(yè)銷售公司。鼎恒石油公司總部設(shè)在四川成都,在加拿大大不列顛哥倫比亞省成立了分公司。我公司與多家世界知名制造廠商建立了緊密的合作關(guān)系。
注:該文章由鼎恒石油編譯,轉(zhuǎn)發(fā)須注明出處。
附英文原文:
Designing highly engineered control valves for the Mundra to Bathinda Crude Oil Pipeline
Weir has successfully delivered two large, high pressure Blake borough valves to support India's capacity expansion project
Weir Valves & Controls have designed and delivered two large Blakeborough® control valves to support the expansion of one of India's key crude oil pipelines.
The Mundra to Bathinda pipeline is owned and operated by HPCL – Mittal Pipeline Limited, and runs from the port of Mundra on India’s west coast through to Bathinda located in the northern part of India. The pipeline consists of a single point mooring system, crude oil terminal and 48” pipeline. The pipeline runs for 1017km through the Gujarat, Punjab, Rajasthan and Haryana.
The pipeline Capacity Expansion Project (MCEP) will be commissioned in 2017/2018 and will improve the capacity of the pipeline, ultimately up to 18 Million Metric Tons Per Annum (MMTPA). Weir received an order in late 2016 from Engineers India Ltd. to supply two relatively large, high pressure control valves for the project. The two valves are 24” (600mm), flanged, Class 900 rated control valves with self-contained electro hydraulic actuators. The valves will be fitted into a 28” pipeline where they are required for discharge pressure control of the crude oil. The valves have a total design Cv of 4750. The valves were recently shipped to the client after undergoing stringent functional test procedures to confirm control performance.
Simon Tattersall (Weir Valves & Controls Sales Director) commented: "This project shows Weir’s versatility in producing a wide range of valves for both the power and oil & gas industries. Our control valve engineering capabilities mean that we can work with customers to supply standard and bespoke valves to suit the exact customer requirements."
客戶只需支付產(chǎn)品價格,無需支付任何其他費用,如包裝費或運費,且不設(shè)置起定量。
鼎恒所有產(chǎn)品提供半年的質(zhì)量保證,鼎恒代理品牌可提供1年的質(zhì)量保證。
假如某些產(chǎn)品不符合需求,在保證外包裝完整的前提下,鼎恒將安排退貨并且快速發(fā)貨。
鼎恒所有提供的產(chǎn)品均擁有進品報送資料和原品證明,保證正品。